PetroMasila has the necessary capabilities to perform strategic projects in the energy sector in Yemen, as may be required and directed by the Government. Some of such projects are briefed below:

Wadi Hadhramout Power Plant (75MW)

PetroMasila constructed a 75MW Power Plant in Block 10 to serve the population in Wadi Hadhrmaout. The project was commenced in December 2016 and launched in January 2018. PetroMasila operates the plant and provides it with gas fuel from its blocks.

Aden Power Plant (264MW)

On July 20, 2018, PetroMasila signed an MOU with General Electric to construct a 264MW Power Plant in Aden. The project has reached an advanced stage and expected to be launched in 2020.

Upgrade of Aden’s Power Transmission Network

The project includes building three electric substations in Al-Hoswa, Al-Mansoura and Khormakser in Aden. Besides, electric overhead lines and underground cables will be extended among those areas to allow effective transmission and utilization of generated power. The project is still under implementation. 